The Gigapop interconnect will be moving from the CNS to the Main Switch port xe-0/0/11. The Gigapop has requested the port be set up as a single channel port channel in preparation for adding an additional 10 G link later this year. Can we get a volunteer for the config? -- Jay Hanke CTO, CCIE #19093 Mankato Networks LLC PO Box 54 619 S Front St Mankato, MN 56001-3838 Google 530-618-2398 jayhanke@mankatonetworks.net http://www.mankatonetworks.com http://www.neutralpath.net ######################################################################## To unsubscribe from the MICE-DISCUSS list, click the following link: http://lists.iphouse.net/cgi-bin/wa?SUBED1=MICE-DISCUSS&A=1
On Fri, Sep 20, 2013 at 02:22:15PM -0500, Jay Hanke wrote:
The Gigapop interconnect will be moving from the CNS to the Main Switch port xe-0/0/11.
The Gigapop has requested the port be set up as a single channel port channel in preparation for adding an additional 10 G link later this year.
Can we get a volunteer for the config?
Sure all set and done. Setup for a port-channel/LAG. No LACP enabled. First time for an Aggregate interface setup on this switch stack, so some new ae interfaces will probably need to be probed on the cacti graphs after I just enabled them. (GigaPOP will be ae0) -- Doug McIntyre <merlyn@iphouse.net> -- ipHouse/Goldengate/Bitstream/ProNS -- Network Engineer/Provisioning/Jack of all Trades ######################################################################## To unsubscribe from the MICE-DISCUSS list, click the following link: http://lists.iphouse.net/cgi-bin/wa?SUBED1=MICE-DISCUSS&A=1
participants (2)
-
Doug McIntyre
-
Jay Hanke