Thanks Ben!! On Mon, Jun 14, 2021 at 19:03 Ben Wiechman <ben.wiechman@arvig.com> wrote:
OSP crews are being mobilized, splicers are engaged, cut is near lake crystal MN. No ETA
Looks like there is an OTDR distance from the internal notes. Will need to locate specific location of the cut once crews arrive on site.
Ben Wiechman Director of IP Strategy and Engineering Direct: 320.256.0184 Cell: 320.247.3224 ben.wiechman@arvig.com 150 Second Street SW | Perham, MN 56573 <https://www.google.com/maps/search/150+Second+Street+SW+%7C+Perham,+MN+56573?entry=gmail&source=g> | arvig.com
On Mon, Jun 14, 2021, 18:10 Ben Wiechman <ben.wiechman@arvig.com> wrote:
Fiber cut between Mankato and LaSalle is the word I have. Don't have much more status information than that. Believe Zayo is still working to nail down the location.
Ben Wiechman Director of IP Strategy and Engineering Direct: 320.256.0184 Cell: 320.247.3224 ben.wiechman@arvig.com 150 Second Street SW | Perham, MN 56573 <https://www.google.com/maps/search/150+Second+Street+SW+%7C+Perham,+MN+56573?entry=gmail&source=g> | arvig.com
On Mon, Jun 14, 2021, 18:01 James Urwiller < james.urwiller@turnkey-telecom.com> wrote:
Did anyone else loose all MICE peers around 14:20 CST? I have a ticket open, but no response as of yet.
James Urwiller
Network Architect
Stealth Broadband
james.urwiller@stealthbroadband.com
------------------------------
To unsubscribe from the MICE-DISCUSS list, click the following link: http://lists.iphouse.net/cgi-bin/wa?SUBED1=MICE-DISCUSS&A=1
------------------------------
To unsubscribe from the MICE-DISCUSS list, click the following link: http://lists.iphouse.net/cgi-bin/wa?SUBED1=MICE-DISCUSS&A=1