Doug, Sounds great, thanks for the work on this! -Nevin On Friday, April 3, 2015 5:53pm, "Doug McIntyre" <merlyn@IPHOUSE.NET> said:
On Tue, Mar 31, 2015 at 11:50:19AM -0500, Doug McIntyre wrote:
I should schedule up a time when I swap out the RR's with the new hardware. I have them ready, just need to get them there at online.
And this process is done.
I have both new sets of hardware installed and happy. I have roughly the same # of routes coming into each being distributed out. The routing looks good from the RR's as well as my site (ipHouse).
I also left my last build of a route reflector hardware (the one with the SAS6/i controller, so no battery, no battery deep cycle testing) as a cold spare here. Jeff has offered up another R320 when they are done as another cold spare I believe, so we'll have two loaded up cold spares ready to go. If I bring in some duplex power cables, I could make them warm spares, ready to kick over with DRAC when needed, I have some in my pile, since I don't use them. (obviously they'd still be A + B power, not single powered).
Should be all good. Speak up if not. -- Doug McIntyre <merlyn@iphouse.net> ~.~ ipHouse ~.~ Network Engineer/Provisioning/Jack of all Trades
-- Nevin Lyne -- Founder & Director of Technology -- Arcustech, LLC. - arcustech.com -- Gippy's Internet Solutions, LLC. - enginehosting.com