On Thu, May 19, 2011 at 10:07:37AM -0500, Mike Hemphill wrote:
It looks like we (Dave Farmer & FWR) will be putting up a second Gig link over copper between the CNS & core MICE sw later this AM.
Dave and I have completed the ether channel to bring it up to a 2Gbps cross link between the two switches.. MICE-gig-sw-1#show etherchannel port-channel Channel-group listing: ---------------------- Group: 1 ---------- Port-channels in the group: --------------------------- Port-channel: Po1 ------------ Age of the Port-channel = 0d:03h:38m:32s Logical slot/port = 11/1 Number of ports = 2 GC = 0x00000000 Port state = Port-channel Ag-Inuse Protocol = - Port security = Disabled Ports in the Port-channel: Index Load Port EC state No of bits ------+------+------+------------------+----------- 1 00 Gi1/2 On 0 0 00 Gi2/45 On 0 Time since last port bundled: 0d:00h:12m:09s Gi1/2 Time since last port Un-bundled: 0d:02h:19m:56s Gi2/45 It looks like the traffic load balancing is a little uneven, but Dave and I will keep watch on it. -- Doug McIntyre <merlyn@iphouse.net> -- ipHouse/Goldengate/Bitstream/ProNS -- Network Engineer/Provisioning/Jack of all Trades ######################################################################## To unsubscribe from the MICE-DISCUSS list, click the following link: http://lists.iphouse.net/cgi-bin/wa?SUBED1=MICE-DISCUSS&A=1