Construction and splice crews are still in route. No ETR. Ben Wiechman Director of IP Strategy and Engineering 320.247.3224 | ben.wiechman@arvig.com Arvig | 224 East Main Street | Melrose, MN 56352 | arvig.com On Thu, Sep 10, 2020 at 2:29 PM Ben Wiechman <ben.wiechman@arvig.com> wrote:
There appears to be a cut around Floodwood. Technicians arrived on site to identify the specific location of the cut/break about 20 minutes ago. No ETR yet.
Ben Wiechman
Director of IP Strategy and Engineering
320.247.3224 | ben.wiechman@arvig.com
Arvig | 224 East Main Street | Melrose, MN 56352 | arvig.com
On Thu, Sep 10, 2020 at 1:38 PM Lou Pliml <LPliml@compudyne.com> wrote:
The MICE Duluth extension switch is offline due to a yet confirmed fiber cut. Arvig reports that they have lost light on the connection and have technicians on the way to investigate.
There is no ETR at this time
Louis Pliml | Network Services Administrator
Compudyne | 306 W Michigan Street – Suite 200 | Duluth, MN 55802
lpliml@compudyne.com | 218.216.6938 | compudyne.com <http://www.compudyne.com/>
Duluth | Hibbing | Saint Paul | Marquette | Houghton
------------------------------
To unsubscribe from the MICE-DISCUSS list, click the following link: http://lists.iphouse.net/cgi-bin/wa?SUBED1=MICE-DISCUSS&A=1