On 04/25/2017 08:20 PM, Jeremy Lumby wrote:
I am planning on doing the final round of moves to the Arista switch on the afternoon of 5/9/2017 beginning at 1PM. The second route server will be moved to the new cabinet, as well as the following connections to the main switch will also be moved:
Great Plains Acentek Consolidated Communications Long Lines HBC Savage UW System Radio Link LTD Broadband Integra Inteliquent Hoyos Consulting Visionary (Mammoth) Code42 Emergent HCMC Unggoy
I suggest that all members listed above shutdown BGP by 12:00PM CST to avoid dropped packets while being moved. Please leave the interface up so that we can test link, as well as the ability to ping the interface IP. Additional notice will be sent immediately before and after the maintenance.
Jeremy Lumby Minnesota VoIP 9217 17th Ave S Suite 216 Bloomington, MN 55425 Main: 612-355-7740 x211 Direct: 612-392-6814 EFax: 952-873-7425 jlumby@mnvoip.com
######################################################################## To unsubscribe from the MICE-ANNOUNCE list, click the following link: &*TICKET_URL(MICE-ANNOUNCE,SIGNOFF);